Michael Baker was engaged by the U.S. Army Corps of Engineers Louisville District as designer of record for the design-bid-build delivery of two identical Annual Training-Mobilization Dining Facilities at Fort McCoy, Wisconsin. Each 21,290-square-foot, one-story facility was modeled after the client’s Operational Readiness Training Complex standard design and tailored to support the base’s mobilization training needs. The new dining facility accommodates 1,428 personnel per meal through three 30-minute shifts of 476 personnel, with capacity to serve three meals per day. The building includes a 9,000-square-foot dining area, a 3,000-square-foot kitchen, men’s and women’s restrooms, administrative offices, mechanical, electrical and communications rooms, two Mobile Kitchen Trailer pads with utilities, and exterior storage space.
Michael Baker’s multidisciplinary scope included architecture, structural, mechanical, electrical, plumbing, civil and fire protection engineering, comprehensive interior design, communications distribution design, anti-terrorism/force protection design, cost estimating, site improvement, and landscape architecture. The team also completed topographic survey, geophysical and geotechnical investigations, utility capacity analysis and related reports to inform the design.
Facilities were designed in compliance with the client’s Facilities Standardization Program requirements and applicable federal, state and local codes and standards, including UFC 4-171-05: Army Reserve Facilities and the Environmental Protection Agency’s Clean Water Act and Clean Air Act. Michael Baker’s building design incorporated reinforced concrete foundations and floor slabs, structural steel framing, mechanical, electrical, information, security and fire suppression sprinkler systems, automated HVAC and lighting controls, energy-efficient lighting, durable interior finishes, window systems, hipped standing-seam metal roofing, and masonry exterior facades.
The interior design scope emphasized durability, maintainability and long-term performance for a high-use dining environment. Finish selections included through-body colored porcelain tile, quarry tile flooring and washable paint finishes chosen to withstand heavy traffic, frequent cleaning and extreme seasonal temperature changes. Furniture selections were developed to maximize seating capacity while standing up to wear from multiple dining shifts each day. Close coordination among the base, interior designer and commercial kitchen consultant helped create a cohesive state-of-the-art kitchen and servery that opens seamlessly into the dining area.
Michael Baker’s electrical design included power, lighting, fire alarm and mass notification, structured cabling raceway, public address, cable television distribution, telecommunications and security systems. To protect the facility in the event of fire, the team integrated an automatic wet-pipe sprinkler system designed in accordance with UFC 3-600-01, NFPA 13 and the International Building Code. The design also specified a fully addressable, intelligent fire alarm and mass notification system. DFAC is that the building’s design included winterization provisions intended to allow the buildings to be fully secured during periods of inactivity and protected from Wisconsin’s severe winter conditions, ensuring that all interior finishes, systems, and components remained intact and undisturbed.
Our team performed construction cost estimating using MCACES MII, developed BIM deliverables in Revit and prepared specifications in SpecsIntact. Construction phase services, including shop drawing and request for information reviews, as well as participation in construction progress meetings was also provided by Michael Baker.
At-A-Glance
- LEED© Silver
- Design-build delivery
- 9,000-square-foot dining area
- 3,000-square-foot commercial kitchen