Michael Baker provided architecture and engineering services for comprehensive interior and exterior renovations to the FBO Passenger Terminal and Charter Terminal at Pittsburgh International Airport. The project enhanced passenger flow, terminal operations, aesthetics and the overall user experience while supporting uninterrupted airport operations through a phased construction approach.
Services included architecture, interior design, mechanical, plumbing, fire protection and electrical engineering, as well as cost estimating. Michael Baker’s team programmed and designed upgraded interior spaces, including floors, walls, ceilings, lighting, mechanical and plumbing systems, fire protection and fire alarm modifications, furniture, artwork and accessories.
The Passenger Terminal was the primary focus of the renovation. Michael Baker evaluated the Horizon Drive entrance, including signage, canopy modifications, entrance doors and related features, and developed a design concept for a more prominent main entrance that reflected the client’s brand. Interior improvements included a quiet room for private phone calls and conferencing, a new customer service desk, upgraded conference rooms, a passenger lounge, pilot lounge and sleeping area, and refreshed private offices.
The renovation was carefully phased to keep at least one terminal operational throughout construction. Work began with the Charter Terminal so it could function as a stand-alone facility. Once complete, FBO Passenger Terminal operations temporarily shifted to the Charter Terminal while the passenger terminal was renovated. After construction, primary operations resumed in the FBO Passenger Terminal, and the Charter Terminal returned to serving sports teams and charter groups. The project was delivered in six phases: programming, schematic design, design development, construction documents, bidding and negotiation, and construction administration.
At-A-Glance
- Scope: Renovation of FBO Passenger and Charter Terminals
- Key Outcome: Modernized passenger experience and operations through a phased renovation that maintained continuous airport functionality throughout construction.