Michael Baker and partners managed the completion of an iconic treatment plant upgrade in New York City, saving millions and the environment – and creating a tourist attraction
From the Summer 2017 issue of Signature
Helping to bring a major urban wastewater processing facility into compliance with federal laws, even while greatly reducing the plant’s pollution of a vital waterway, would represent quite an achievement. Imagine, then, transforming that same plant into an award-winning model of modern infrastructure that also provides a waterfront nature walk and serves as an educational tourist attraction – all the while completing the project under budget by $71.7 million.
That’s exactly what Michael Baker International and its partners accomplished at the Newtown Creek Wastewater Treatment Plant in Brooklyn, N.Y.
The treatment complex, the largest of 14 wastewater treatment plants owned and operated by the New York City Department of Environmental Protection (NYCDEP), processes wastewater from sections of Brooklyn, Queens and Manhattan from its location along Newtown Creek and Whale Creek.
The underlying challenge: The plant had been plagued by a phenomenon common to wastewater facilities that combine the management of sanitary wastewater and stormwater — intake of excessive rainwater and stream overflow that often exceeded the plant’s handling capacity. During “wet weather” events, some of that untreated wastewater would make its way into the creeks and then flow from Whale Creek to the East River, polluting this waterway and damaging the ecosystem.
Following the establishment of a consent order with a major oil company, the U.S. Environmental Protection Agency in 2005 entered into a consent order with NYCDEP to reduce biologic and nonbiologic discharges into Newtown Creek. The upgraded NC-WWTP has exceeded the requirements of the consent order. The secondary treatment requirements of the federal Water Pollution Control Act of 1972 (commonly known as the Clean Water Act) mandate 85 percent removal of sediment and grit from treated wastewater; the new plant removes 92 percent.
To comply with the Clean Water Act, as well as the consent order with NYCDEP, NYCDEP developed a three-phase, $5 billion expansion and- upgrade plan. The third and final phase, which would prove the most ambitious, included four distinct projects: construction of a Central Residuals Building to remove all non-biological matter from wastewater; upgrading of the South Battery and Control Building, which provides grit removal, aerobic processing and biological setting; construction of a new sludge loading dock, including maintenance dredging of a Superfund site; demolition of the old East River Sludge Storage Tank and decommissioning of the East River loading dock.
The construction management team also had the challenge of performing a never-before-done, highly dangerous interior lining inspection of the plant’s eight 140-foot-high, egg-shaped anaerobic digesters, which treat organic sludge and reduce landfill gas emissions. The stainless steel-clad domes also would feature an artistic touch: exterior illumination by blue LED lighting.
HIGH-PROFILE “CITY WITHIN A CITY”
To provide construction management services for this complex and multifaceted $1.3 billion expansion phase, NYCDEP contracted with a joint venture that included Michael Baker, Gannett Fleming and Shaw Group. (CB&I acquired Shaw during the project and took its place in the partnership.) The tri-venture, as it became known, handled project management, constructability reviews, resident engineering inspection, schedule management, delay analysis, contractor and stakeholder partnering and community outreach.
“We’ve performed construction management and design services for New York City for about 30 years, including work on the North River, Coney Island and Hunts Point wastewater treatment plants,” says Iris Giboyeaux, project manager in Michael Baker’s New York office. “This was the biggest project that we’ve done for them.”
As if the task weren’t complicated enough, the plant’s location elevated the degree of difficulty. The facility sits squarely in the densely populated neighborhood of Greenpoint, Brooklyn — Giboyeaux calls the plant “a city within a city” — and also along heavily traveled routes for water traffic, meaning that every step of the project required comprehensive and precise coordination with local elected officials and residents, as well as marine traffic using the waterways.
“The location of the plant made it a high-profile project,” notes Giboyeaux. “Our work was easily visible for close to a decade. “We were running all 12 prime contractors full time for at least three years,” she continues. “On any given day, we would have hundreds of men and women from different trades in the field. At one point, we had at least eight cranes on site.”
To interface with the public, the team worked closely with the Newtown Creek Monitoring Committee.
Says Nat Federici, deputy portfolio manager for NYCDEP’s Bureau of Engineering Design and Construction: “The community was heavily involved through the committee. We told them up front we would be as honest as we could be. I think they appreciated that. They had to live with 20 years of construction, and we wanted them to feel like they were part of the process, to know that they mattered.”
MANAGING SCHEDULING COMPLEXITY WITH 4D BIM INNOVATION
Because of the project’s complexity, the tri-venture continually faced the risk of falling behind schedule. To mitigate that risk, the tri-venture deployed an innovative technique called 4D building information modeling (4D BIM), which goes one step beyond the more commonly used 3D-modeling approach. The 3D-modeling approach allows users to view images of the project from all perspectives. 4D BIM, meanwhile, allowed the tri-venture to add the element of time, that is, to preview the planned future actions of any contractor or subcontractor to determine their potential impact on the completion schedule. If that impact were adverse, the tool’s “clash detection” feature would allow the tri-venture to identify and halt the procedure.
“It’s become standard now, but at the time we were doing that, not too many people had 4D BIM capability,” says Tom Zagorski, practice lead, construction services, for Michael Baker. “It allowed us to tackle more proactively the problem of having 12 contractors on site at the same time — and be smarter about it. You could see how the project was being built at any point in the schedule, and you could investigate problems before things were built. It was a great tool to look into the future and try to identify problems. It brought the project back on schedule and paid for itself tenfold.”
The 4D BIM tool proved its worth many times, Zagorski says, in one case detecting and forestalling a “clash” — an oversized pump that, if installed, could have slowed the project appreciably while costing unbudgeted dollars to repair. “It enabled us to deliver the project with a change order rate of only 1.2 percent,” Zagorski notes. “You usually see that in the 10 percent to 12 percent range.”
MULTIPLE AWARDS, MULTIPLE COMMUNITY BENEFITS
The tri-venture completed the bulk of the project in late 2014 — on time and, thanks to the efficiency noted by Zagorski, almost $72 million under budget (final paperwork and wrap-up are set for 2018).
The engineering/construction management industry has recognized such efforts by the tri-venture in a variety of ways.
The New York chapter of the American Council of Engineering Companies, at its 50th Annual Excellence in Engineering Awards Gala in April 2017, bestowed on the project and the tri-venture management team its Diamond Award, Wastewater and Stormwater category, and the National Honor award. The Engineering Society of Western Pennsylvania named the project “Project of the Year” in the Industrial category.
Even before the tri-venture completed the project, the project also won the 2013 Excellence in Environmental Engineering and Science grand prize for design for the South Battery upgrade, and the development of the Central Residuals Building was featured in the March- April 2014 issue of CMAdvisor, the national newsletter of the Construction Management Association of America.
MAJOR ENVIRONMENTAL GAINS
Perhaps even more significant are the multiple benefits to NYCDEP and the residents it serves. First and foremost, the initiative increased the plant’s daily wet-weather-processing capacity from 310 million gallons to 720 million gallons, a 132 percent increase in capacity that means a significant reduction in untreated water escaping the treatment facility during heavy rains. As a result, the agency effectively reduced East River pollution and satisfied the requirements of federal law and the consent decree.
The environmental benefits don’t stop there. To creatively use the gas produced by the digesters, New York City and several private-sector partners teamed to begin a bio-gas program that is expected to heat nearly 5,200 homes while reducing annual greenhouse gas emissions by more than 90,000 metric tons annually. To increase the production of bio-gas for home heating, the city and its partners arranged to have pre-processed organic food waste from school lunches delivered to the plant and added to the digestion process.
“What made this project unique for me,” Giboyeaux says, “is the huge environmental component, which you won’t see on other infrastructure projects outside of the NYCDEP. We had to help our client meet a consent decree or expose it to potentially millions of dollars in fines. It was a very crucial project for the residents of New York City and the surrounding environment. A project this size probably won’t happen too often in my career.
“We had to accomplish this massive undertaking while keeping the plant operational,” she adds. “It’s like performing open-heart surgery, except the patient is the wastewater treatment plant, and it’s very much awake during surgery. There’s zero room for error on a project like this. Without the appropriate resources of a group of highly trained professionals at the top of their game, it wouldn’t have been possible.”
A NATURE TRAIL, TOURS…AND A VIEW OF MANHATTAN
Moreover, NYCDEP put the under-budget cost savings to productive use on behalf of local residents. NYCDEP created a quarter-mile nature walk, designed by acclaimed environmental sculptor George Trakas, as the the first phase of an amenity at the plant that eventually will include a community park and a pedestrian bridge across Whale Creek.
Even more improbably, the eight signature digesters, which offer unimpeded, breathtaking views of Manhattan from a glass-enclosed observation deck, have become both a tourist attraction and a popular backdrop for film crews. The digesters appeared as nuclear reactors in the movie “Wall Street: Money Never Sleeps” and as an Indian chemical plant in an episode of “Madam Secretary.”
Tours of the plant itself can prove surprisingly fun, NYCDEP’s Federici says. Case in point was a series of Valentine’s Day events a few years ago, when the NYCDEP gave every participant a chocolate Hershey’s Kiss, which is similar in shape to the digesters, courtesy of The Hershey Company. However, those tours imbue a serious purpose as well. When it hosts school groups, professional organizations and environmental groups, NYCDEP uses the opportunity to educate them about the role of the Newtown plant.
“We usually start the tour with a 30- to 45-minute presentation on what we do here,” Federici says. “Then when we take them to the top of the digesters, they have a bird’s-eye view of the entire facility and can see in action the processes we just described for them.”
One final benefit: Impressed by the 4D BIM capability which Michael Baker and its partners introduced, NYCDEP has included it as a requirement in a number of subsequent Requests for Proposals. That ensures the benefits of the Newtown project will spread to future developments as well.
Federici, who has worked on the initiative for 11 years, considers the Newtown Creek upgrade a “once-in-a-career project.
“One of the greatest satisfactions is knowing the community has something that’s a source of pride,” he says. “Usually, a wastewater treatment plant is something you want to hide or mask. Here, new facilities across the street are mimicking our architecture. We’re a centerpiece, an educational center for our department. That adds a piece you normally don’t find.”
Michael Baker’s iconic New River Gorge Bridge helped transform a West Virginia mountain region
From the Fall 2017 issue of Signature
Benjy Simpson beams like a kid, even at age 69, as he approaches the giant New River Gorge Bridge atop these steep Appalachian Mountains in the heart of Fayette County, W.Va. Despite knee problems borne of years of mountain climbing, rappelling, whitewater rafting and jumping out of airplanes, this outdoorsman-turned-businessman hardly can wait to lead yet another group of visitors across a catwalk just below the deck of his beloved arch bridge.
At the center of the bridge’s iconic steel arch, 1,515 feet across the catwalk, Simpson points down to a convoy of river rafters bucking in the world-class rapids that rip through the gorge some 851 feet below – far enough down to make some bridge walkers gasp, grip the hand rails even more tightly and cautiously measure the distance to the other side.
Simpson, a West Virginia transplant, runs a popular business next to the bridge called Bridge Walk, which has been providing guided catwalk tours of the bridge since his company opened in 2010 in a partnership with the West Virginia Department of Transportation and the National Park Service. As perhaps the bridge’s biggest ambassador, Simpson seems to know every detail of the bridge and its history: its corrosion-resistant steel beams, made by U.S.X. Corp. and constructed by its subsidiary, American Bridge; the fact that inspectors can climb inside those beams; the unique expansion rockers where vertical beams meet the arch; the number of ironworkers who built the bridge; and even the spot where the Oprah Winfrey Show once had a woman rappel off the bridge to conquer her fear of heights. He has framed pictures to back him up.
In many ways, Simpson serves as the honorary keeper of the bridge, resident historian, and, as he sometimes refers to himself when watching out for mischief, the Bridge Troll. And his countless bridge tales captivate his visitors, like the time a paraplegic man BASE-jumped off the bridge with a parachute – in his wheelchair – during a recent Bridge Day festival. Or how kids used to sneak up on the bridge’s arch during construction in the 1970s and jump off, into a safety net below.
“It was a rite of passage,” he says of the illegal antics, shaking his head.
But there’s one fact about this bridge – memorialized on a U.S. quarter, postage stamp and countless tourist collectibles – which Simpson can’t seem to wait to remind his patrons, and he declares it with a sense of genuine reverence and admiration: The New River Gorge Bridge was designed by Michael Baker International.
“I have a passion for this bridge,” Simpson readily admits. “Not too many people love it like I do.”
A DESTINATION BRIDGE
Who could blame Simpson, though? As this entire region of West Virginia comes together to celebrate this now-historic bridge’s 40th anniversary, we can pause for a moment, not just to contemplate the initial impact of designing an architectural wonder that connected two mountains and their small communities, as this bridge did. Or the fact that this four-lane bridge and highway reduced the travel time, mountain to mountain, from 45 minutes down and up a barely two-lane, switch-back road – especially for big trucks – to less than a minute.
“The history of West Virginia can largely be written by its inaccessibility and isolation versus opening the door” with the bridge, says David Perry, a local resident and former state delegate who used to haul steel via truck to the bridge site and whose father, a local pastor, gave the invocation on the day the ironworkers brought the two halves of the steel arch together on the bridge. “It has changed the fabric of the state.”
Instead, let’s consider the fact that this bridge at once captured the world’s attention and opened up a highway corridor streamlining travel from Toronto, Canada, all the way down to Miami. At the same time, the bridge has created a rather profound Appalachian gateway and steel-framed destination for tourists and outdoor enthusiasts from around the world, all looking to explore unique habitat and the region’s coal history, rappel down the side of a mountain, or take on the world-class white-water rapids of the New River Gorge and Gauley River. Or just see the bridge.
“Of the 7,244 bridges in the state of West Virginia, this is the crown jewel,” says Jim Wriston, chief transportation engineer for the West Virginia Department of Transportation’s Division of Highways and in-house local bridge expert, as he calls himself. Wriston grew up nearby, he says, and watched the construction process in the 1970s as he admittedly participated in his own “rite of passage” on occasion with his friends.
Still, he credits the bridge with influencing his decision to become a civil engineer and work for the state. Walking out onto the catwalk with his visitors recently, he shares Simpson’s youthful enthusiasm for the bridge, even with his two shirt-pocket protectors full of pens and his trademark untied necktie.
“This is the bridge,” he proclaims.
A BRIDGE TO ECONOMIC OPPORTUNITY
Meanwhile, the bridge has opened up new opportunities for the National Park Service, outdoor adventure outfits, resorts, music festival producers and the agriculture sector, as well as for communities such as Lansing on the north side of the bridge and Fayetteville, Oak Hill and even Beckley on the south side. And all of this continues to evolve and grow even 40 years later.
Officials there have been reminding the world every fall of the bridge’s impact on the region with its annual Bridge Day celebration, which, with the exception of 2001, when the U.S. Department of Homeland Security urged officials to cancel the festival, continues to draw thousands of people annually and is said to bring into the local economy more than a million dollars in one weekend.
“These are the kinds of opportunities we live for – not only to design great works of infrastructure, but also to make the communities we serve safer, more accessible, more sustainable and more prosperous,” says Brian A. Lutes, CEO of Michael Baker. “The New River Gorge Bridge exemplifies our number-one tenet as a company, that ‘We Make a Difference.’ This bridge has a prominent place in the Michael Baker legacy.”
CROSSING THE GORGE
Talk of a bridge over the gorge began as early as 1963, when U.S. President John F. Kennedy directed his Appalachian Regional Commission to come up with a comprehensive economic development plan for the region. Its top priority: developing a modern highway system that would better connect the state. That eventually would include Corridor L, a 70-mile stretch of road that would connect I-79 near Sutton, W.Va., to I-77 in Beckley, W.Va. The commission’s biggest challenge: a short stretch of road that would somehow have to cross over the New River Gorge.
In 1967, the West Virginia State Road Commission hired Michael Baker to design an 11-mile stretch of the highway in Fayette County – including a bridge over the gorge.
According to an application submitted to the National Register of Historic Places by the National Park Service, Michael Baker engineers worked the equivalent of 15 years’ worth of full-time man hours to design the bridge and made more than 4,000 hand calculations. What they designed was a bridge that, at the time, would be the longest steel-arch bridge in the world and one that later would attract imitators and competitors.
“From an engineering and construction viewpoint, this bridge will be truly a most significant undertaking,” according to then-Governor Arch Moore, as reported in The Baker Engineer in 1977. “But, even more importantly, the construction and completion of this project will contribute greatly to the economy of the state in general and the Fayetteville area in particular.” And it did.
ACCESS TO AN ECOSYSTEM
National Park Service officials would be the first to acknowledge the economic benefits of the bridge over the years. Today, the park service oversees an estimated 100 miles of wild rivers in the region, as well as federally protected land around the rivers, including several old, abandoned coal towns. It also maintains a bustling and historically robust visitor center and viewing decks along the north rim of the gorge, right next to the bridge and only about 100 yards from the entrance to Bridge Walk.
Today, the National Park Service employs 120 people to manage this recreation area, including 75 permanent positions. The region attracts more than a million visitors annually.
“This bridge has opened the whole area to north and south traffic and created an incredible economic opportunity,” says Lizzie Watts, a National Park superintendent who oversees the New River Gorge region. “There are incredible resources in the New River area, ecosystem-wise. It has one of the highest diversities of plants, including rare and endangered plants, warm-water fisheries, great hiking, boating, biking and birds.
“And,” she adds, “the bridge itself offers our guests a way to get here.”
A BRIDGE TO WHITE WATER
Melanie Dragan, whose family is credited with basically creating the white-water rafting industry in the New River Gorge area, says the family faced tremendous challenges in 1968, when it first transplanted from Pittsburgh, Pa., to launch Wildwater Expeditions Ltd. She says her guides would take rafters on two-day “expeditions” along the river because of the isolation and inaccessibility back in those days. That all changed, she says, when the New River Gorge Bridge was built, along with the highway.
“It totally opened up the area, giving easier access for more people to white-water raft,” says Melissa Dragan, Melanie’s daughter, who also guided rafters down the rivers. “The bridge became a connector and increased the popularity of the region. And it helped to develop the town of Fayetteville.”
Simpson says he first came to the region to go white-water rafting while working with delinquent youth in the Pittsburgh area as part of an outdoor program to rehabilitate them. He remembers driving down with his wife and having to navigate Route 82, the narrow, barely paved road that drops down the north rim of the gorge to the tiny enclave of Fayette Station along the river.
“It took me an hour to go nine miles,” he says. “My wife said we’re never going that way again.” And they didn’t have to after that.
In 1982, thanks largely to the bridge, Simpson moved his family from north of Pittsburgh to Oak Hill, just south of the bridge, after acquiring a white-water rafting company. That’s when he says he just kept seeing the bridge during rafting trips.
“Like everybody else, I was on the river and telling people the best places to take pictures of the bridge,” Simpson says of his early days in the New River Gorge region. “I just thought it was a neat feature.”
Economic opportunity also brought Dave Arnold and his partners to the gorge. He says he and initially four partners launched Adventures on the Gorge in 1977 and ran their first rafting trips in April 1978.
“Big outfitters hadn’t settled here before because it was a long drive – seven to eight hours – from the nearest major cities,” says Arnold, who today remains a partner and serves as senior vice president of public relations and strategic partnerships for the company.”
During the company’s first year of business, Arnold says, his team took about 2,000 people down the river on rafts. Today, the company boasts a sprawling resort in Lansing that includes a lodge, cabins, a camping area, restaurant, pool and a host of outdoor activities.
“About 100,000 people use our facilities today, coming from all 50 states and at least 15 foreign countries,” Arnold says. “We have 14 partners today and almost 600 employees.”
HOW THE BRIDGE SUPPORTS MOUNTAIN AGRICULTURE
Even the state’s agriculture industry has received a major boost over the years, thanks to the bridge and Corridor L.
“It’s all about getting commerce out of the state,” says Crescent Gallagher, director and legislative liaison of the communications division of the state’s Department of Agriculture. He says southern West Virginia has seen “a lot of economic development in rural areas,” including raising livestock in the hills, for instance. The improved infrastructure, he notes, has supported what has become a $400 million-a-year industry around poultry.
“It opened up a whole new world,” Gallagher says, “and bridged the gap to a new economy.”
THE SENTINEL EVENT OF THE YEAR
Of course, West Virginia continues to celebrate this iconic bridge with its own Bridge Day festival. On the third Saturday of October, the region literally shuts down the bridge for a day to allow visitors the opportunity to walk across the bridge. It’s also the one day of the year when pre-registered BASE jumpers can pay for the opportunity to jump off the bridge and parachute into the gorge. “It’s like a fair festival on steroids,” says Sharon Cruikshank of the Fayette County Chamber of Commerce and Bridge Day Commission chairperson. “It’s the only day people legally are allowed to walk across the bridge. It generates more than a million dollars in one day for the region. It’s phenomenal; it’s iconic.”
Fayetteville transplant Bill Wells moved with his wife, Sally, to her hometown of Fayetteville recently to capitalize on the tourism growth around the bridge and Bridge Day. The pair bought a historic 192-acre farm along the main road in town and now is working to restore the farmhouse for special events. In the meantime, the couple also is using the property to host a Bridge Day-weekend bluegrass-music festival called Bridge Jam, complete with food vendors, craft beers, on-site camping and music groups such as the Kentucky Headhunters and Georgia Satellites.
Last year, says wife Sally Wells, the music festival attracted 800 people.
“We’ve definitely benefited from the bridge,” she says.
“CONNECTING TWO WORLDS”
William Laird, who served four terms as sheriff of Fayette County before retiring and held a standing position on the Bridge Day Commission, says he sees an even bigger long-term benefit from the bridge and highway corridor.
“I’m a home-grown tomato, and I think this bridge had the effect of connecting two worlds,” says Laird. “I see it as an engineering phenomenon that removed barriers, and not just transportation-wise. It also enhanced economic development. It brought together communities north and south [of the gorge]. It was a true cultural unifier.”
Bringing innovative desalination processes and improved water resource management to Southern California communities
From the Summer 2017 issue of Signature
As a young teen growing up in Southern California, Ron Craig designed and built a water irrigation system for the lawn of his parents’ new home. It worked so well, he reminisces, that his neighbors asked him to build similar systems for them.
Even then, he already had found ways to combine his interests in solving problems, designing and building, community outreach and entrepreneurship into a micro-enterprise dealing with the management of one of California’s most coveted resources: water.
Great practice, it seems, for what ultimately would become for Craig, now West Region water supply-wastewater leader for Michael Baker International, a long and impassioned engineering career helping communities, counties and the State of California with their water management issues.
Craig and his team navigate contentious water politics and policy, as well as issues involving access, sourcing, environmental laws and permitting, desalination and other technological innovation, to generate, conserve and otherwise better manage water resources for the City of Chino Hills and other Michael Baker clients, from Monterey to San Diego and beyond.
“We combine technical expertise to package all of the elements that need to physically be put into place for our clients,” says Craig, who acknowledges having to embrace the three-fold roles of visionary politician, technical expert and navigational change agent for the company’s clients, particularly through what he calls “concept” projects.
“Institutionally, technically and environmentally, we bring a high level of expertise in all of these areas,” says Craig, who is based in Michael Baker’s Temecula, Calif., office. “We know there will be changes. We’ll have to help our clients navigate through each wave, but we’ll bring you through it.”
Adds Anna Lantin, director of Michael Baker’s West Region: “We’ve had to wear many hats, from technical, community planning, and outreach. But we also live and play in these watersheds, so we have a personal stake in managing them.”
DESALINATION, RECYCLING ANDOTHER DROUGHT-DRIVEN SOLUTIONS
As of this past spring, heavy rains and record snow packs from northern California to the southern part of the state ended a prolonged drought, while taking out roads and bridges and scattering mud and debris up and down the coast. Even though the most recent drought now is considered history, Craig says the West Region still is challenged with a lack of potable water to meet an ever-growing population. Many of the systems now are vulnerable because of aging infrastructure and the potential for seismic activity in the region.
Still, long before the latest drought, Michael Baker teams from Temecula, Santa Ana, San Diego, Rancho Cordova and other California offices had been working closely with the state, local communities, water basin boards, water districts and other fiercely territorial political entities to identify alternative sources of water, from seawater and brackish groundwater to storm runoff, recycled wastewater and surface water imported from other watersheds.
Then Michael Baker engineers and planners help clients develop long-term plans – and in some cases new technologies – for securing sustainable sources of drinking water.
They have provided engineering consulting, environmental studies, design, regulatory permitting, construction management, economic analysis and pilot testing over the last several decades in efforts that have led to the development of a long list of sometimes politically charged projects to desalinate seawater and brackish groundwater (water with high levels of salt and nitrates due largely to decades of agricultural operations).
Among them: The Coastal Water Project in Monterey Bay, the Poseidon Seawater Desalination Project EIR in Huntington Beach, the Beverly Hills Groundwater Reverse Osmosis Plant, the Mojave Water Agency R3 Project, the Camp Pendleton intake pilot testing project and, perhaps most prominently, two Chino desalination plants.
At the same time, Michael Baker teams have helped the likes of San Diego and other cities and towns with efforts to completely recycle their wastewater for either reuse or as a source of revenue, selling the treated water to other communities in times of surplus as part of their own water source planning programs. All have required major investments by state and local governments, as well as various public agencies that control watersheds and manage groundwater basins and regional and local water districts.
“Water is getting expensive to secure and treat,” says Lantin in response to such investments. “It’s rare, and the sources of water are very limited here.”
These conditions further propel the need for Michael Baker teams to help clients overcome complex political, design, regulatory and other formidable challenges.
“We have faced one wave after another of hurdles with regulatory agencies, stakeholders, construction solutions, even basic design,” Craig once said in describing a typical large-scale water project involving multiple agencies, water sources and communities. “Collaboration is the key in overcoming every hurdle. We just roll up our sleeves and work side by side through every challenge.”
OUT OF WATER: A CHINO HILLS SUCCESS STORY
The City of Chino Hills, located in the hills southeast of Los Angeles, probably understands the importance of collaboration, long-term planning, investment and engineering guidance more than most communities in the region, thanks in large part to Craig and his Michael Baker team. And a one-time crisis that left the city with virtually no water.
“There was an environment of minimal competencies” with regard to sound water supply planning and management,” Craig says of Chino Hills during that crisis. “There was a lack of communication between operations and engineering staff and City Hall and no collaboration with surrounding agencies.”
Initially, the city drilled more wells into the ground and built more above-ground water storage facilities in an effort to meet its growing demands. As a result, Craig says, the city said it had increased its water supply capacity to 19 million gallons a day.
“In reality, it was closer to only 8 million gallons a day of sustained supply,” Craig says. “And when heavy Santa Ana conditions would set in, with 90- to 100-degree weather, certain water tanks would be bone dry for three to four days at a time, and major water customers had to be shut off.”
The City of Chino Hills hired Craig and his team in 1996 to resolve the water crisis and align the city with a more sustainable supply management plan. Craig and the Michael Baker team have served the city ever since.
“One of the best investments the City of Chino Hills makes is in having Michael Baker’s Ron Craig on its team,” says Nadeem Majaj, director of public works and city engineer for the city over the last five years. “Mr. Craig has led the water efforts on behalf of this city for decades and on multiple fronts. Through innovation and diplomacy, Ron and the city staff rescued the city.”
Adds Craig about the moment he and his team stepped in to help: “We had to lead – where do we find water?”
SECURING A LONG-TERM WATER SUPPLY
This was where Craig’s knowledge of the politics and economics of water management in southern California came in handy. Craig, pursuing a balance of diplomacy, negotiation and advocacy on behalf of Chino Hills, began interactions with the Santa Ana Watershed Project Authority (SAWPA), which was made up of “a lot of wholesale agencies” within the watershed of the Santa Ana River.
As it so happens, SAWPA had been working to secure funding partners and “subscribers” that would support efforts to build and later expand a desalination plant in Chino, not far from Chino Hills. Michael Baker also would have the opportunity to provide engineering and other services separately for the Chino Desalter projects to SAWPA and, more recently, the Chino Desalter Authority (CDA).
The desalters’ role: to desalinate a local and plentiful source of groundwater within the watershed, “cleaning up legacy groundwater pollution from citrus agriculture and dairy farms,” Craig says. “There was a legacy buildup of nitrates and salts from fertilizers and manure.”
Following considerable negotiations, Chino Hills agreed to subscribe to the desalination plant, which would desalinate and treat water for potable use and pipe it to Chino Hills for use and storage. Initially, that subscription arrangement supplied upwards of one-quarter of the city’s overall water supply demands. Today, that number has climbed to nearly 30 percent, Majaj says.
“With his extreme technical knowledge and diplomacy, Ron was able to negotiate the construction and coownership of water lines and wells,” Majaj says. “And Ron now represents us on the Chino Desalter Authority as one of the entities and at the Chino Basin Watermaster supporting regional partnerships and management.”
Under the current agreement, Majaj says, Chino Hills is entitled to 17 percent of the treated water that has been processed through the desalination plant, which amounts to an estimated 4,200-acre-feet of water annually.
“Without that, we would have had to import water, and we already were pulling capacity from our wells,” Majaj explains.
OTHER NOT-SO-FRINGE BENEFITS
As Craig and his team had calculated, the ultra-clean desalinated and treated water not only replenished Chino Hills’ storage facilities and supplemented the city’s own well water, it also blended with the well water, substantially improving the overall quality of the blended water for residents over what they had been receiving without the desalter subscription.
Given the severe drought of the last several years, the desalter-supplied water also provided an additional source of water that allowed Chino Hills to continue to provide water for residents without the imposition of severe austerity measures experienced by residents elsewhere in the state.
“The city fared very well because of our multiple sources of water, thanks to people like Ron Craig,” Majaj says. “We have been able to withstand the recent severe drought and are confident that we will continue to do so in the future.”
Still, he continues, the city did elevate its drought-alert stage to a Level 3 during the drought, rationing water used outdoors to two days a week. Moreover, the city itself took steps to reduce its own water use, including changing public landscapes to include more-drought-resistant plants and shrubs. Those measures reduced the city’s own water use by 50 percent, according to Majaj.
“We actually were able to save 28 percent in 2014 over the amount of water we used in 2013,” Majaj says of the city’s water conservation efforts. “So we never had to worry about running out of water.”
That goes for the future as well. “The state has determined that the drought is over, but we’re continuing with certain conservation mandates,” Majaj says of the combination of water source diversity and conservation efforts. “It’s absolutely needed. [The drought] is really never over. It’s cyclical. It could be a very short time before it happens again, and it could be even more severe next time.”
Adding to the desalter-treated water, Craig also secured for Chino Hills a seven-year agreement with a regional sewage treatment agency to treat all of the city’s wastewater and then sell it back to the city as recycled, providing yet another source of local water.
Water agencies throughout the West Region, Craig says, face difficult decisions on how much diversity of supply, redundancy and sustainability to their portfolios they can afford.
“It’s about water security,” Craig says of his team’s efforts with Chino Hills and other cities in the region, as well as with the company’s work with the Chino Desalter and other desalination plants. “It’s about reliability and redundancy. We help provide for them more diversity in their water portfolios and acquire more water rights. For Chino Hills, we got way ahead of the curve.”
How Michael Baker is helping two major rail companies develop a new generation of efficient, cost-effective intermodal rail terminals that connect cities, producers and consumers
From the Fall 2017 issue of Signature
For 25 years, an old rail yard straddling McKees Rocks and Stowe Township, Pa., along the Ohio River just beyond Pittsburgh’s city limits, sat vacant, an overgrown reminder of the region’s once-thriving steel industry. The rail yard – located on a flat, industrialized edge of the borough known as The Bottoms, had served over the previous century as a rail interchange, locomotive rebuilding facility and rail maintenance shop for the former Pittsburgh and Lake Erie (P&LE) Railroad, which hauled coal, coke, steel and passengers. Until it didn’t. That was in 1992.
Twenty-five years later, you might hardly recognize this 70-acre site amidst what could be described as another remarkable riverfront transformation for the Pittsburgh region led by visionary business, civic and community leaders and Michael Baker International. That is, except for the site’s railroad tracks.
Today, the site – developed by railroad giant CSX into a state-of-the-art intermodal rail terminal as part of its $850 million National Gateway Initiative – stands as a testament to the resurgent freight transportation industry and the importance of moving raw materials and manufactured goods efficiently and cost-effectively across the country and around the world. But we’ll come back to that.
It also speaks to the opportunities ahead for Michael Baker to help engineer and manage the construction for such intermodal transformations – a notion for which Michael Baker has prepared well when it comes to amassing the right expertise and experience to take on these unique engineering and construction management challenges.
“Intermodal terminals are critical to the efficient movement of containerized freight and consumer goods,” says Tom Zagorski, practice lead, construction services for Michael Baker. “I like to call them inland ports. You get the same benefits, except there’s not a boat involved.”
TRAINS, TRUCKS … AND GROWTH OPPORTUNITIES
Development of intermodal terminals has become a key priority for the freight transportation sector, providing a variety of benefits. They facilitate transport, of course, ultimately helping industry reduce costs and pass along savings to consumers – while delivering significant environmental and public benefits.
U.S. freight railroads, projecting solid growth over the next 30 years, have been investing significantly in maintaining and modernizing rail infrastructure. According to the American Society of Civil Engineers, in its 2017 Infrastructure Report Card, the freight railroad industry in 2015 spent $27.1 billion on maintaining, growing and modernizing the railroad system. And the U.S. freight industry projects a 40 percent increase in shipments over the next 30 years.
Michael Baker’s involvement with rail yards and terminals began in 2006 with a small Ohio project – Gest Street Yard expansion in Cincinnati – for railroad giant Norfolk Southern Corp. This was an expansion of an existing intermodal terminal that enabled Michael Baker to build a foundation for rail yard and terminal design experience. The size of the projects and complexity grew, as did Michael Baker’s collective experience and credibility.
“We designed access roadways, drainage, tracks, rail bridges, walls, tunnels, lighting and power and air systems, and we handled environmental permitting,” says Kirsten Bowen, a project manager in Michael Baker’s Cleveland office, of those earlier projects. “That enabled us to put our finger on the pulse of client needs.”
From those experiences, Michael Baker has established itself as a major player in rail yard and terminal development. Working with clients Norfolk Southern and CSX, Michael Baker is providing such services as design, permitting, pre-construction, construction, construction management, quality assurance and inspection.
Here’s a look at four of these innovative projects – three completed, one in the pipeline:
DEVELOPING CSX’S NEW PITTSBURGH TERMINAL
CSX, based in Jacksonville, Fla., considers intermodal terminals so vital that it created the $850 million National Gateway Initiative, a public-private partnership, to develop an interconnected network of strategically located terminal sites and routes with double-stack clearance for intermodal trains, maximizing the ability to efficiently serve markets in the Midwest and mid-Atlantic corridors.
For the new Pittsburgh-area facility, which opened in September 2017, CSX acquired a vacant, 70-acre rail yard, located just west of Pittsburgh’s city limits along the river in Allegheny County, to support its hub-and-spoke approach to national intermodal freight transportation. Then it engaged Michael Baker to help develop its state-of-the-art terminal and serve as the owner’s representative in overseeing the construction of the project.
“CSX is committed to serving the growing needs of our current intermodal customers and others who can benefit from the speed and efficiency of intermodal service,” says Fredrik Eliasson, CSX executive vice president and chief sales and marketing officer. “Our newest facility in Pittsburgh will connect southwestern Pennsylvania to markets across the country and around the world.”
CSX describes the Pittsburgh facility, which required a $60 million investment by the rail company, as the “last key component” of CSX’s national initiative, a public-private partnership designed to create what the company describes as a highly efficient network of double-stack rail and intermodal terminals. By design, CSX notes, the network will connect East Coast markets to consumers, manufacturers and businesses in the Midwest.
AN ‘AMAZING TRANSFORMATION’
Preparing the long-vacant industrial site in the Pittsburgh area, though, did pose its share of challenges for Michael Baker and its construction partners. As is the case with most brownfield sites, years of industrial operations can leave behind contaminants and old materials that require removal and mitigation measures. So the Michael Baker team worked to ensure the site was fully restored in a safe, environmentally friendly manner, navigating strict guidelines and preserving an important Stowe Township water line that runs through the site.
“The key to the success of the project,” says Giuseppe Mammana, project manager for Michael Baker in Pittsburgh, “was working closely with the owner and the construction team members and being able to roll up our sleeves and work side by side with the team.”
After two years’ construction, the Pittsburgh Intermodal Rail Terminal debuted in September 2017, featuring two processing tracks, one support track, one lead track and four administration/operations buildings. The site also includes three large, rubber-tired gantry cranes capable of stacking containers four high between trucks and trains, which gives the facility an annual lift capacity of 50,000 intermodal containers.
“To witness the amazing transformation from a vacant, overgrown rail yard to this clean, high-tech intermodal facility has been a fulfilling experience,” says Adam Walkowiak, on-site construction engineer from Michael Baker’s Pittsburgh office. “Even more rewarding now is seeing the final completion of the project and knowing the positive impact it will have on this community.”
Says Allegheny County Executive Rich Fitzgerald: “The terminal will not only help connect Western Pennsylvania’s businesses to the global marketplace, it also will help stimulate McKees Rocks’ and Stowe’s economies.”
PUTTING SHIPPERS CLOSER TO THEIR MARKETS
Norfolk Southern, based in Norfolk, Va., meanwhile has established, with help from Michael Baker and others, an East Coast artery it calls the Crescent Corridor, a 2,500- mile grid of rail and intermodal terminals that facilitates shipping, diverts long-haul trucks from roadways and sparks local economic development across 11 states, spanning Louisiana to New Jersey.
“Norfolk Southern has invested in the Crescent Corridor to provide customers with a fast, direct route between the Southeast and the Northeast while offering a range of truck-competitive shipping options that include connections to the West Coast and Mexico,” says Christine Traubel, assistant vice president, intermodal and automotive, for Norfolk Southern. “The intermodal facilities we’ve developed on the corridor have created additional freight capacity, improved transit times, and put shippers closer to their markets, which helps reduce their overall supply-chain costs.”
As part of the $2.5 billion public-private partnership, Norfolk Southern has introduced four new intermodal facilities along the Crescent Corridor, including in Birmingham, Ala.; Memphis, Tenn.; Charlotte, N.C.; and Greencastle, Pa., near Pennsylvania’s capital of Harrisburg. Michael Baker provided engineering and construction management services for the Greencastle facility.
Norfolk Southern located its $97 million Greencastle facility on a 200-acre greenfield. Development therefore brought a different set of environmental considerations, including wetlands and stream relocations.
“We were connecting with the local water and sewer systems and affecting local roadways,” says Will Snyder, a project manager for Michael Baker who managed the project. “We met regularly with the township to discuss these matters.”
Transforming invasive salt cedars and abandoned sand pits into economic development success in Buckeye, AZ
From the Fall 2018 issue of Signature
The Gila River, Arizona’s second-largest river, was slowly choking. Never mind Southwest Arizona’s arid, desert climate or even the sand-and-gravel mining companies that had prospered along the river’s meandering path around the city of Buckeye, southwest of Phoenix. This interloper had grown up along the river’s banks, spread out and kept growing, planting its roots deep in a region where it did not belong. And it contributed to the emergence of a floodplain that was dampening the prospects of new economic development and growth in the region.
The culprit? An invasive species of tree called the Tamarix, or, as locals refer to this non-native invader, the salt cedar. These fast-growing, high-salt-content trees had become a scourge to aquatic life in the Gila, as well as to the surrounding riverbanks and inland areas – so much so that the region between the river and Buckeye had evolved into a federal floodplain, causing a devaluation of property and a host of economic development obstacles.
Of course, the pockmarked collection of flooded mining pits left behind along the river when sand-and-gravel miners shuttered their operations did not help the situation either, at least not for the less-than-visionary. For some, though, those flooded and abandoned pits, filled with water from the region’s shallow groundwater table, took on the look of bodies of water with economic development potential – if the tree and floodplain issues could be resolved.
Clearly, Buckeye leaders contended, something needed to be done for the future of the city and region. What if they could find a way to elevate this river region from an area roughed up by nature and industry into something more? Something better? Something to maximize the river’s and region’s inherent beauty and economic potential?
That “something” ultimately took the form of a visionary master plan, titled “Reclaim the River; Enliven the Banks: A Vision Plan for Buckeye’s El Rio District.” Leading the entire planning process in partnership with the city was Michael Baker International.
BRINGING THE OLD RIVER BACK
Overall, the master plan lays out regional goals to return the Gila River to its natural condition by restoring riparian habitats and, in turn, leveraging those assets to enhance the local recreation and economic development potential of lands adjacent to the river.
Central to that plan, which Michael Baker then helped to refine to incorporate timing and budget issues, is a specific project to establish the El Rio District, a strategically significant 3.5-square-mile area located just south of Buckeye’s historic downtown along the banks of the Gila River. The city contracted with Michael Baker to help lead that project.
“Regionally, the salt cedar trees were restricting the flow of flood waters, which expanded the floodplain,” Matt Klyszeiko, community planning practice lead for Michael Baker’s Phoenix office, says of the overarching challenge facing the planning team. “The thinking was, if the river could be brought back to its original condition, it would not be as impeded, and the floodplain could be made smaller. Farmers as well would benefit as the floodplain went down, creating a vibrant ecosystem in the heart of an urban environment.”
Adds Adam Copeland, principal planner for the city of Buckeye and project manager on the city side for the El Rio District project: “Revegetating the river to what it was 100 years ago became an important early priority.”
The final plan, which city officials already have begun to implement, significantly reduces the damaging effects of the salt cedar trees, and it also provides guidance and a framework from which local developers are beginning to develop the areas around the flooded sand-and-gravel pits into hubs of recreation and entertainment. Consequently, the Gila is beginning to regain its historic stature as an Arizona treasure.
HELPING BUCKEYE TAKE THE LEAD
“Over the last 20 years, different mayors and county officials have wanted to develop a master waterway plan for 17 miles of the Gila River,” Copeland says. “So we came up with a framework and really only scratched the surface. A plan to enable recreation, restoration, trails and economic development was adopted in 2006. The mayor of Buckeye, a real leader, pushed the project forward. In fact, we were the first city in the region to come up with a program to support the master plan.”
Copeland says the El Rio District project received a unanimous vote to approve it, including 14 city and county representatives.
“They since have said they want to see more projects to mirror this one, because of the quality of work done,” he explains. “A lot of economic development progress depends on the city investing in an area, and we have that with Buckeye. Arizona’s Senators, along with the governor, all support our efforts, and all agree that this project can only help with economic development.”
Michael Baker’s Klyszeiko says his team facilitated many preliminary discussions with city staff and others on needs of the area and stakeholder expectations to kick-start the project. They also partnered with a number of technical experts to address the project’s many complexities.
“A lot of specialists worked on complex issues, with Michael Baker making sure all pieces fi t together,” Klyszeiko says. “This has been a very enjoyable project. The city has been a great partner.”
GUIDING URBAN DESIGN RECLAMATION, DIALOGUE AND FUNDING
Partners – many of them – played a sizable role in the Gila River project, particularly given the many technical facets of the proposed long-term transformation. The master plan fused urban design principles, a river restoration program, sand-and-gravel reclamation guidelines, local community dialogue to create a framework for change within the study area and an innovative funding mechanism that would provide a key underpinning to so much that would occur: an in-lieu fee (ILF).
Within the context of mitigating the impact of development on federally designated wetlands, developers are required to pay a special permit fee, or in-lieu fee, to a third party in lieu of conducting their own project-specific mitigation.
“The in-lieu fee created a funding mechanism to provide the necessary tools to implement key parts of the plan,” Klyszeiko says. “A key benefit for this project was when it teamed with the Arizona Fish Commission because they were able to implement the ILF. The ILF needed to follow federal guidelines because it affected the defined watershed and the ‘washes’ permissible as development progressed.”
Other innovative components of the Gila River project included:
- Developing a unique “planning continuum” of new land uses
- Creating specific regulatory procedures for the preservation and restoration of high-quality river habitat
- Identifying salt cedar management methods
- Designing flood-protection measures
- Incorporating active and passive recreational opportunities
- Applying creative land-use planning tools to drive the transformation process beyond the pages of the document and define a new legacy for Buckeye along the Gila River
TURNING MINING PITS INTO LAKEFRONT RECREATION HUBS
One of the most visible and high-impact innovations, however, came with the transformation of abandoned sand-and-gravel mining pits into lakefront centers for recreation and economic development. A commitment to partnership carried the day here as well.
“As we worked with the city to look at used and dormant industrial mining sites, we urged private-property owners to contribute a long-term vision for river corridor,” Klyszeiko says of the gradual transformation. “Sand-and-gravel operations will expand; It is a successful business, and we would not want to impede that. Working with the state industry association, we agreed to a Sand-and- Gravel Mitigation Plan.”
As Klyszeiko explains, those mining operations have a certain life span, and when they are finished at a site, it leaves open bodies of water behind.
“Michael Baker worked with mining operators to have these water bodies repurposed once the industrial operations have moved on,” he says. “This helps to address a legitimate concern. We do not want to avoid the elephant in the room.”
Adds Copeland, the city planner: “The question among the various players has been, how can we help each other out? The mining companies basically said that, as long as we can operate our business, we will participate in being good stewards of the environment.
“These mining pits were located in the floodplain, which meant they had limited commercial value,” Copeland continues. “The city, however, saw tremendous value in these locations as venues for community amenities.”
To date, developers have reclaimed and developed the land around at least one of the former sand-and-gravel pits. Now area residents enjoy concerts, fishing and other forms of recreation along an attractive waterfront venue.
“Participating in this way creates an economic boom for the region and for private investors, who are becoming more interested in developing these new sites,” Klyszeiko says. “It is also good for the mining companies themselves because this development potential actually increases the value of their land.”
Copeland agrees. “Everyone connected thought it was a fascinating project that touched every aspect of planning, public and private partnerships,” he says. “We have linked these new ‘lakes’ together for recreational purposes, while still permitting mining companies to conduct their business at working pits. It connects downtown Buckeye with different land-use fixtures. We still see a lot of opportunity along the riverbank.”
BIRD INVENTORIES, FLOOD CONTROL, TRANSPORTATION AND STAKEHOLDER ENGAGEMENT
The complex nature of the built, natural and social systems within the Gila River study area required complete and detailed technical analysis. This included collectively assessing regional environmental and flood control initiatives; conducting bird species, habitat and vegetative community inventories; analyzing specific land use and alternatives for development; developing transportation and economic development objectives; and encouraging local resident and stakeholder engagement.
“Returning the Gila River to a healthy state, along with the positive development and regional participation we have seen, has brought national recognition of the benefit to Buckeye,” says Klyszeiko.
Adds Copeland: “The precedents established here have created a toolbox to be used over the next 20 to 30 years as this project continues to expand and develop.”
Copeland describes the city’s relationship with the Michael Baker team as great.
“We have known a lot of the folks there for a long time,” he explains. “Michael Baker brought a reputation that gave us a lot of comfort. They had a good team put together during the bid process that has performed very well. They have always had a great, eloquent way of working with different stakeholders. From the most technical engineering professionals to interested members of the community, people feel comfortable talking with the team at Michael Baker. As a result, some great cooperation has resulted, and some great ideas have been generated.”
“This is a planner’s dream project,” Klyszeiko says, “to work on something so forward-thinking and complex, but also realistic and attainable.”
Krista Stippelmans is a SPRAT Level 2 Rope Access Engineer and the Rope Access Team’s Equipment Manager based in Denver, Colorado. Throughout her eight-year tenure at Michael Baker International she has performed numerous complex major river crossing inspections and strived to break down barriers for women in the rope access community. Her work with Pigeon Mountain Industries (PMI) on the development of the next-generation Hira harness has led to her becoming a Vertical Specialist with the manufacturing company.
What are your main duties as Equipment Manager?
As Equipment Manager, I manage inventory and order team gear as needed. I also build relationships with life safety equipment manufacturers and understand how their products can suit our needs. This means I get to engage in conversations about how we can better equip our team or adjust our systems for efficiency.
How did you get connected with PMI, and what role did you play in product development?
When I entered the rope access industry, I struggled to find a harness that fit in all the right places. Each piece of personal equipment I needed had many options for men but few to none specifically for women. Being the first female on Michael Baker’s rope access team, I looked to outside vendors for recommendations. I knew PMI, a major rope and safety gear manufacturing company, had a female CEO, Loui McCurley, who was deeply invested in the rope access world and contacted her for support. After some back and forth, we decided to collaborate on a harness specific to women that would follow the anatomy of the wearer and become a new market for their company. Initial tests with the first prototype started in August of 2019. I received my own harness from PMI this past fall and plan use it as a part of my climbing kit next season, beginning with Michael Baker’s Climb School in April.
On PMI’s product page, it boasts the Hira harness as “The most advanced concept in women’s harnesses at height.” While working on this product, what features did you deem necessary?
The leg loop connectors are mounted inside the front risers, which allows the rope technician to completely release the leg loops to use the restroom while on the job, instead of having to completely remove the harness. This feature quite literally affords me the opportunity to stay hydrated while working and preserves my energy for my essential inspection tasks. The alternative in the past has been expending significant amounts of mental and physical energy to get to a place (the ground, a platform at the center of the bridge 20 panel points back, etc.) where I could safely remove my harness.
As an added perk, the harness features thick seat pads that cradle the leg comfortably to form a built-in work-seat that naturally lifts the legs into an ergonomic, seated position. The thinner, contoured shoulder straps provide firm support without rubbing on my neck while working.
How does a female-specific harness make your routine inspections more secure?
I-40 Hernando de Soto Bridge, which spans the Mississippi River between Arkansas and Tennessee. When the crack was discovered by one of my teammates, I was hanging on rope from the side of the bridge, performing my own inspection.
Our Rope Access Program Manager John Zuleger’s MAYDAY communication came over our radios and our team quickly and safely evacuated to the deck, while our team on the ground called in the critical find and alerted emergency services. This is something we hope to only need to prepare for on paper or in training environments, and never in the field, but I could not be prouder of the way our team handled this emergency scenario.
Transforming the Cuyahoga River’s industrial ship channel – and Cleveland – with trails, fish habitat, education and a natural park setting
From the Spring 2017 issue of Signature
Between the shores of Lake Erie and the Cuyahoga River in Cleveland, a stretch of aging, under-utilized industrial land and an old shipping channel lined with metal plates – armor – wound their way unremarkably south around this northeast Ohio city. The river and shoreline, framed by an impressive city skyline and an iconic steel vertical-lift drawbridge, meandered slowly past neglected red-brick warehouses, rail yards and overgrown vacant lots. It flowed almost unnoticed beneath several highway overpasses, paying a sort of homage to the region’s once-thriving rustbelt heyday but offering little in the way of fish habitat, recreation, education – or nature – on its way through the city.
It offered much potential, though, according to a diverse consortium of economic development agencies, city planners, developers and environmental organizations. A potential, they concluded, to rethink, reshape and rebuild that urban river corridor into something purposeful, aesthetically beautiful, educational, restorative and sustainable socially, economically and environmentally. And that’s just what this group has done, with design and engineering guidance from Michael Baker International.
They called the multi-phase restoration project the Cuyahoga River AOC Restoration (AOC stands for “Area of Concern,” an official governmental designation). A team of Michael Baker engineers, designers and scientists from the firm’s Cleveland office served as the lead contractor for this multimillion-dollar, long-range sustainability effort that already has proven popular and a welcome improvement to the waterfront in Cleveland.
“The stakeholders are extremely pleased with the completed project, which was opened to the public this past summer,” cited a letter from the Cuyahoga County Department of Public Works, in nominating Michael Baker for a national award based on this project. “[Michael] Baker’s ability to manage this context-sensitive design project, coupled with complex coordination of the multiple stakeholders, was exceptional.”
ARMORED OBSTACLES FOR FISH, PEOPLE
The project has focused on the armored and dredged ship channel in the lower 5.5 miles of the Cuyahoga River, which connects Lake Erie to the natural river upstream. Armored plating and vertical bulkhead line virtually the entire shoreline of the ship channel to allow 650-foot freighters adequate shore-to-shore navigation space through the channel.
The project’s stakeholders had realized over time that, while accommodating to large cargo vessels, the ship channel had become a source of impairment to the Cuyahoga River and the Cleveland area because of the river’s dredged depth, slow flow, armored shoreline and the absence of a functional riparian edge. From a purely environmental perspective, the channel created a difficult habitat especially for fish, which migrate annually from Lake Erie through the channel, on their way to upstream spawning beds.
The project, according to Jeff Broadwater, manager of Michael Baker’s highway and bridge engineering practice in Cleveland, encompassed the restoration of 3,000 linear feet of fish habitat within the ship channel, while also transforming two adjoining properties – 11 acres that had served local industry as a rail yard and coal storage area – into a restored native habitat and park. With that restoration complete, the AOC Restoration group then added a new mile-long, shoreline Towpath Trail that would traverse through the new habitat, as well as visitor facilities, educational exhibits and other amenities.
In addition to habitat restoration services, the Michael Baker team designed an almost-one-mile section of the habitat-restored trail, including alignment development, evaluation of drainage impacts, and preparation of best management practices. The team also provided Phase II environmental site assessment, a remediation work plan, and an asbestos and hazardous materials investigation to address possible soil and groundwater contamination.
That also included the proper disposal of 5,000 cubic yards of soil that had been dredged from the river, and the “hotspot” removal and disposal of 7,000 cubic yards of contaminated soils. The effort resulted in a long stretch of public-friendly, natural – and attention-getting – riverside park.
“As the project has advanced, it also has served as a catalyst to stakeholders to move design forward for the remaining Towpath Trail projects, creating excitement among the stakeholders and public to find ways to overcome any new challenges associated with the trail projects in the urban environment,” says Broadwater, who led the Michael Baker effort. “We saw this, as the various groups involved in this project helped with grant applications and securing additional funding to complete the trail.”
THE IMPORTANCE OF STAKEHOLDER BUY-IN
This project, with all of its layers of complexity, represents a multi-agency collaboration involving a wide and disparate number of organizations. Among them: The City of Cleveland, Cuyahoga County Department of Public Works, Cleveland Metroparks and Canalway Partners. All entered into a project development agreement with defined responsibilities to construct the remaining six miles of Towpath Trail in the City of Cleveland as part of a 100-mile-plus trail system called the National Heritage Corridor Ohio and Erie Canal Towpath Trail. The formal agreement helped cement stakeholder buy-in of this long-term sustainability initiative and secure funding to advance the construction.
The agreement also helped the group move its project plans forward in light of the goals of other regional organizations, which coincided with this group’s.
Additional stakeholders included: the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, Cuyahoga Valley National Park, Ohio Department of Natural Resources, Ohio Cultural Facilities Commission, Ohio Department of Transportation, Northeast Ohio Regional Sewer District and Cuyahoga River Remedial Action Plan. The Port of Cleveland also has contributed time, equipment and staff to help repair shoreline cargo booms and remove debris.
A MORE FISH- AND VISITOR-FRIENDLY SHORELINE
One of the outcomes of the project was to modify existing riverbanks to support fish habitat. That meant adjustments to the shoreline, which is lined with vertical metal plates or bulkheads along most of the river in the ship channel. To accomplish this, Michael Baker’s plans called for underwater inspection and assessment of the bulkheads, whose conditions varied wildly, from good to failed. Bulkhead replacement would prove extremely expensive – estimated at $3,000 per foot, multiplied by close to 3,000 feet of shoreline in question. Replacement of the existing bulkhead became a major cost concern for the restoration group.
In response to this challenge, the Michael Baker team developed a holistic site renovation approach to site development, given sheeting and bulkhead conditions. Failed sheeting or wooden bulkheads were removed, retrofitted or abandoned where the shoreline could be pushed back, with slopes to create more natural riverbanks. This approach also included allowing for river enthusiasts closer access to the channel for fishing or viewing freight vessels in areas of good, intact sheeting. The Michael Baker team also worked with stakeholders to develop a rehabilitation plan for the deteriorating sheeting to both extend the life of the sheeting and improve the fish habitat.
Overall, the excavation and embankment portion of the riverfront project entailed removal of 7,000 cubic yards of contaminated soils. The contractors then repurposed any remaining non-contaminated soils onsite to build the Towpath Trail – 33,000 cubic yards in all – plus a one-foot clean-fill cover of natural embankment totaling 12,000 cubic yards.
RECLAIMING A BEAUTIFUL LANDMARK
The project also included the acquisition of vacant post-industrial and commercial property, along with environmental cleanup of contaminated soils on the site and site restoration, planting of native species of trees and other plants, and construction of a trail and river overlook. This overlook has proven one of the most popular elements of the project, providing visitors with free access via the new trail to observe the juxtaposition of the working river, industrial activity, city skyline and natural habitat.
The new development extends the Towpath Trail, a 100-mile-plus national heritage corridor, into downtown Cleveland. It also expands the footprint of Cleveland Metroparks, one of greater Cleveland’s most revered public assets, into the inner city. Metroparks also has developed educational programs around the trail system for school kids to experience nature within the city, further enhancing the trail’s value as a long-term educational resource and source of community outreach.
The Towpath Trail extension in Cleveland consisted of four stages. Stage 2 has been completed; Stage 3 construction, with 1.9 miles of trail, is scheduled to begin in 2017; and Stage 1 and remaining portions of Stage 4 are scheduled to begin in 2019 and 2020, respectively.
“The catalyst for those adjacent trail projects to provide enhanced connectivity has been the Cleveland Foundation’s Centennial Trail, which was constructed by Cleveland Metroparks,” says Michael Baker’s Broadwater. “They also have served as a catalyst for reconstruction of the adjacent Scranton and Carter Roads, long-neglected roads in poor condition. Even though connectivity to the Towpath Trail, as well as nearby residences, has yet to be fully established, the trail has seen regular use by joggers, walkers and bird watchers.”
ENVIRONMENTAL REBIRTH IN THE CITY
The comprehensive environmental cleanup of contaminated soils and overall restoration of this site to a natural state clearly has improved habitat for fish and birds in the Cuyahoga River ship channel. Michael Baker’s plan called for construction of four fish habitat zones and six bio-retention cells to provide not only improved fish habitat, but also to assist in more sustainable stormwater management.
The design included a segregated area for fish, located away from public access, to ensure more successful fish migration and spawning. It also called for the installation of a floating boom to keep out debris and reduce artifcial lighting, which minimizes light pollution.
Ohio eBird Hotspots, a statewide avian resource, reported recently that 94 species of birds have been spotted in the natural habitat area since its opening. The types of birds returning to the area include: ducks, geese, swans, grebes, cormorants, herons, vultures, coots, jaegers, kingfishers, woodpeckers, thrushes, starlings, old world sparrows, hawks, kits, eagles, pigeons, doves, caracaras, falcons, jays and crows, among others.
As the project partners complete each phase of the revitalized area, Cleveland Metroparks has assumed maintenance responsibilities, including the planting of supplemental and replacement plantings of native trees, shrubs and flowers along the riverbank, as well as management of the fish habitat.
“It has been so refreshing to attend meetings where the people are excited about a project and can’t wait to see construction start,” says Doug Blank, an engineer with Michael Baker’s Towpath Trail team. “All through this project, we’ve had excited stakeholders and residents. As we were building a big park, people who weren’t aware of what was going on may have thought we were putting in apartments or something, but since people started to see the entire trail come together, the response has been great.”
Even greater, Blank adds, is the fact that, as the project moves forward, more parts of the trail will come together into a larger network of nature trails.
“It just builds more excitement,” Blank says. “All of the connections are scheduled to be made by 2020. This new habitat and Towpath Trail encourage people to get out and about. It’s amazing to see how many people come down there now. What a great feeling for a designer to see the benefits of their work.”
Strengthening environmental awareness and compliance at Marine Corps Base Camp Lejeune
From the Fall 2018 issue of Signature
Marine Corps Base Camp Lejeune in Jacksonville, N.C., already had instituted a Strategic Sustainability Performance Plan and a Qualified Recycling Program when program managers realized they needed to do more to foster meaningful participation in these initiatives among the base’s regional population of more than 137,000 people. Driving this need for participation was a series of consecutive executive orders that define a detailed list of environmental sustainability compliance directives aimed at federal agencies. Among those orders:
- The diversion of 50 percent of non-hazardous solid waste and construction and demolition debris from landfills via recycling programs;
- Two percent annual reduction in petroleum consumption;
- Ensuring that 95 percent of all new contracts require products and services that are energy-efficient, water-efficient, bio-based, environmentally preferable, non-ozone-depleting, contain recycled content, and are non-toxic;
- Increasing the use and generation of renewable energy; and other targeted directives.
OBSTACLES ON THE PATH TO SUSTAINABILITY
Addressing many of those directives proved challenging without changing the mind-sets of people across the base. Obstacles included limited funds; limited manpower to enlist help; a lack of incentives for the rank-and-file, especially since most residents did not pay for their own electric, water and gas utility costs; a transiency among Marines and their families, as well as the commanding leadership; a host of outside contractors lacking both the knowledge of – and incentives to heed – environmental standards; and an apparent disconnect between the base’s environmental initiatives and its daily operations focused on mission readiness.
EDUCATING OUTSIDE CONTRACTORS
Construction workers and other outside contractors had no way of knowing anything about the executive orders and the base’s environmental requirements. To change that, the team helped the Environmental Management Division (EMD) develop a list of environmental standards and acceptable “best practices” to which the contractors would have to adhere going forward.
The team also updated a guidebook for outside contractors to help them better understand the compliance rules and, overall, Camp Lejeune’s environmental stewardship mission, along with ways to effectively comply.
WRITING THE BOOK ON RECYCLING
Before the outreach effort began, Camp Lejeune’s EMD had developed a number of progressive recycling initiatives under its Qualified Recycling Program (QRP). For instance, the team launched recycling efforts to identify and recycle solid-waste items, such as copy machine toner cartridges, used oil rags and batteries, that previously had been discarded in the landfill. The team continued to analyze other waste that could be diverted from the landfill, including household cooking oil, plastics and cardboard, and tested a pilot program for single-stream recycling.
Still, one of EMD’s biggest challenges was awareness and participation in its programs.
To support the base’s Strategic Sustainability Performance Plan, recycling program and environmental initiatives, a series of flyers, brochures, pocket guides, training manuals and even social media campaigns aimed at educating Marines, families and workers on base were developed.
Key among the materials was an environmental-standards guidebook for Marines titled, “Overview of Camp Lejeune Environmental Programs.” This accompanied the guidebook for outside contractors. The guidebook was designed as a go-to reference guide about the military base’s environmental goals and programs that were in place to achieve those goals.
All of those materials ultimately contributed to an increase in participation in the various recycling programs on the base and even led to related initiatives to better manage the base’s supply and use of batteries to conserve energy and reduce waste. The battery initiatives alone resulted in a savings of an estimated $500,000 in long-term procurements costs.
The team also developed an executive-overview-type performance report for base leadership with simple-to-read visuals that used the colors red, yellow and green to denote the level of compliance with the executive orders. While some leadership demonstrated greater interest than others in the environmental sustainability and recycling programs themselves, all took a keen interest in the performance reports, particularly when certain measurements would slide into the red, which signified non-compliance.
REACHING THE PARENTS THROUGH THEIR CHILDREN
The most effective awareness and outreach efforts revolved around engaging the children of those living and working on the military base. The idea was that if the team could engage the children and convince them to establish stronger environmental stewardship habits at home, those children would educate their families and get them to adopt a similar mind-set and habits. The approach, which centered around the development of large-scale, hands-on events for children, worked better than what the team had imagined.
The base’s signature event became an annual Earth Day Expo, which attracted more than 1,000 local children the first year alone. As part of the expo, held on base every April, the team developed upwards of 19 booths and stations – manned by subject-matter experts from across the base and beyond – where the children could interact and learn about the environment, recycling, energy conservation and other relevant topics that supports the EMD’s Camp Lejeune mission.
To help move the children through the maze of educational activities, the team devised a scavenger hunt requiring the children to ask questions along the way and seek answers to specific questions. Also included is an art contest leading up to the Earth Day event and prizes to garner additional participation. The result: annual attendance continues to climb, and schools in the area now are requesting that Camp Lejeune and its environmental team adapt the Earth Day Expo and related environmental activities to take on the road into the neighboring schools themselves.
Eventually, the team succeeded in engaging the Marines themselves in the environmental activities. Among the more successful initiatives: Splash For Trash, in which Marines provided kayaks and other boats to military volunteers to collect trash and clean up the shorelines and beaches.
To maintain a united front on environmental sustainability and recycling, cohesive branding, including a logo for the sustainability program, tied together all educational materials, recycling programs, annual events and even the performance reports. And it worked. Ultimately, notices of violations of directives within the executive orders driving these environmental activities dropped, and compliance across the spectrum improved.
As a result of these hands-on initiatives, the EMD saw recycling increase in family housing within a brief period and are confident this trend will continue.
Michael Baker supports the National Park Service by providing sustainable solutions, infrastructure repair and modernization
From the Fall 2018 issue of Signature
In 1872, Congress established Yellowstone as the first of the country’s national parks, and the National Park System has grown to reflect the compelling diversity of America’s culture and interests. Today, the system spans 417 parks that offer incomparable variety, from battlefields to preserves to seashores to parkways. In 2017 alone, the parks attracted nearly 331 million visitors, employed 22,000 people (counting full-time, part-time and seasonal workers) and infused approximately $35 billion into the national economy. In many ways, America’s national parks are a resource both unique and irreplaceable.
The parks are dynamic, changing to meet new visitor needs and emerging trends in safety and environmental preservation. The National Park Service (NPS) manages that process, working diligently to assure the conservation and sustainability of the parks and their many wonders.
“Michael Baker International served the NPS for more than 16 years, and the NPS has become a special and key client for us,” says Gary Case, project manager and senior environmental scientist for Michael Baker. “We understand the NPS mission to preserve the cultural and historical significance of the national parks, sites and preserves. We look forward to the continued success and satisfaction of assisting the NPS in maintaining and restoring the parks’ beautiful natural resources, along with their individual and overall historic significance for many years to come. Furthermore, we strive that all of our employees working at the parks understand their history and learn what makes each park unique.”
On a number of occasions in recent years, NPS has called on Michael Baker International to help with contaminated site management and sustainability projects. These projects have included remediation of environmental hazards and evaluation and updates of parks’ environmental management systems (EMS).
“We think of the parks as national jewels,” says Mark K. DeJohn, PG, senior geologist for Michael Baker, “but many parks have been affected by past practices and have landfills, leaking storage tanks and abandoned mines that may have been worked before the park was created.”
Here is a look at three of these initiatives and how Michael Baker helps to sustain, protect and support the management of our national treasures.
ELIMINATING A HAZARD AT PALO ALTO
On May 8, 1846, the United States and Mexico engaged in the Battle of Palo Alto, a major conflict that foreshadowed the much broader Mexican-American War. In March 2009, the site near Brownsville, Texas, was designated a national historic park following stints as a national historic landmark and a national historic site. The facility’s visitor center features exhibits and a video about the battle and the broader conflict, and a half-mile trail leads to an overlook of the battlefield. Interpretive panels present the protracted conflict between Mexico and the United States from the perspectives of both countries, providing important context.
Well before the battlefield’s designation as a National Historic Landmark in December 1960, the area was home to many ranches where cattle roamed the land. In earlier times, the cattle were treated in dip tanks to protect them from tick infestations.
“Ranchers used concrete- or brick-lined tanks filled with a pesticide solution to treat cattle,” DeJohn explains. “The tanks were deep enough that the cattle had to swim through them, then drip-dry in a corral. When the dip bath was spent, the rancher would typically dispose of the used solution on site.”
The problem was, while mostly water, the solution contained arsenic. In those years, the solution was dumped on site, where it now poses a potential hazard to park visitors and staff. In hindsight, this practice was deemed not sustainable or eco-friendly, and the residual hazardous materials resulting from these operations would need to be cleaned up. The NPS contracted with Michael Baker to investigate the site and to develop an effective disposal/remediation plan.
“One of our goals is to preserve the landscape and historic natural scenery of each park,” DeJohn says. “We have to implement solutions that do not permanently change the landscape. Here, we came up with a list of options and evaluated them on the basis of effectiveness, sustainability, cost and ease of implementation per federal, state and local requirements.”
Michael Baker found that the contamination was shallow — only about three feet — and proposed a two-part solution. First, the contaminated soil would be excavated. Then, the material would be trucked off-site for disposal in a permitted, secure landfill. The soil excavation was “time-critical,” meaning the most hazardous soil was dug up and removed first, leaving less contaminated soil for removal at a later date. Michael Baker managed the removal operations and restoration activities for the NPS.
Jay Boisseau, PE, the environmental program manager wheel for the NPS Intermountain Regional Office at the time, but who now serves as project manager for line-item construction at the agency’s Denver Service Center, calls the time-critical approach an example of “adaptive management” that has served as a model for similar projects in other parks.
“When you attempt to reduce the quantity of thehazardous material to near-background levels, it gets very expensive,” Boisseau says. “We have removed the main sources of contamination, and what is left is such a small concentration that the migration potential is greatly reduced. We have bought some time to implement the final clean-up remedy.”
Another key element of the plan: the project would occur during the summer, when Palo Alto visitation is historically lowest. The park’s trail was closed only briefly, minimizing disruptions. Now, Palo Alto visitors can enjoy the vistas and contemplate the battle in a much safer environment.
PROSPECTING FOR SOIL AT CANYONLANDS NATIONAL PARK
Possible soil contamination also was the challenge at Canyonlands National Park, which spans 337,598 majestic acres in the heart of Utah’s high desert. The park is a colorful preserve of canyons, mesas, buttes, fins, arches and spires, all of it sculpted into a breathtaking landscape by centuries of water and gravity. Many areas are so remote or rugged that access is by hiking or four-wheel drive only.
In the Needles section of the park, NPS asked Michael Baker to assess a 4.5-acre site near a campground that had been used as a landfill. Michael Baker’s initial investigation in 2009 indicated an assortment of waste products — household trash, bottles, tires, batteries and medical equipment likely used in the park’s paramedic training program — reaching six feet beneath the surface. However, subsequent excavations revealed that the waste actually extended 10 feet below the surface, meaning much more material would need to be removed and trucked off-site.
Faced with a much larger excavation, Michael Baker’s team devised and deployed a simple but innovative technique to solve the problem of additional material. They acquired and used large mechanized screens, much the way gold prospectors would, to separate waste from soil. That way, concentrated waste would be segregated for off-site disposal. Michael Baker’s solution proved to be a very effective method of separating the waste material from the soil and reduced the project cost by almost one-third.
“It became much more efficient and economical because disposal costs are on a tonnage basis,” Ed Kleinkauf, PG, a senior project geologist from Michael Baker, notes. “It was a tremendous savings for NPS.”
As an added bonus, saving all that “golden soil” enabled the team to restore the site more easily and economically, as it greatly reduced the need to acquire and bring in clean fill.
“For revegetation, the park supplied us with seeds and small shoots for plants,” Kleinkauf says. “It is basically a desert area, so we could not go in and hydro-seed. We spread the shoots around in a kind of haphazard pattern to resemble what natural growth would look like.”
Boisseau, who also supervised the Canyonlands cleanup for NPS, confi rms the benefi ts the agency reaped. “Michael Baker’s innovative work with the soil screening system was great for us. They were able to sift a large quantity of soil in a short period of time, and it kept us from generating additional solid waste. Waste reduction is a priority in the NPS.”
As a precaution, the team tested groundwater wells near the campgrounds — no contamination was found — and decommissioned two of the wells. The park later removed the fencing around the campground and now has a clean, safe site should it ever choose to expand this area. This was another example of how the suggested engineering ideas of Michael Baker helped to enhance the park while also preserving the environment.
AN EMS AUDIT FOR JEAN LAFITTE NATIONAL HISTORIC PARK
To ensure that the U.S. national parks employ the most modern and sophisticated sustainability practices, NPS periodically conducts audits of the parks’ environmental management systems (EMS). Such EMS audits are comprehensive with eight required elements that include the parks’ environmental commitment statement, environmental impacts at the park, goals and objectives to maintain environmental compliance, roles and responsibilities, recordkeeping, training and communication. In 2017, NPS engaged Michael Baker to perform an EMS audit for parks in the Southeast Region, including Jean Lafitte National Historic Park and Preserve in Louisiana.
Jean Lafitte National Historic Site, which is named for the infamous early 19th century pirate, includes six physically separate sites with diverse goals. Three of those sites, for example, preserve and interpret the Cajun culture of the region while the Barataria Preserve features trails and canoe tours through bottomland hardwood forests, swamps and marsh. Still another component preserves the site of the 1815 Battle of New Orleans and includes a national cemetery.
Tiffanie Beardsley, environmental specialist in Michael Baker’s Moon Township, Pa., office, headed the audit team.
“They have a great EMS program that is fully implemented and functioning,” Beardsley reports. “During the four-day audit, it was easy for me to verify that the park has done an excellent job of addressing all required system elements and incorporating them into daily park activities.”
Michael Baker conducted and managed the park audit to ensure compliance with NPS standards as well as federal, state and local regulations. To enhance their program, Michael Baker recommended that park strengthen its training element and add follow-up reports for any measures implemented, but the audit overall showed a park meeting its environmental goals.
Enduring weather, wildlife and wildfires to support Donlin Gold’s environmental permitting process
From the Summer 2017 issue of Signature
Donlin Gold. Sounds almost like a mythical Alaskan treasure hunt, with its vast known gold deposits, serious long-term investment – and formidable infrastructure challenges in getting people, equipment and supplies to this massive modern-day gold mining project in the mountainous heart of Alaska’s remote southwestern bush country. Then there’s the permitting process for more than 100 local, state and federal government permits required to develop the mine site.
Unquestionably, this would prove daunting to those working with Donlin Gold, LLC, to help develop an enterprise that one day is expected to extract more than 33 million ounces of gold. But for mine engineering veteran Victor Ross and his rugged team of environmental scientists, biologists and engineers from Michael Baker International, such challenges didn’t stop them from taking on Alaska’s unforgiving weather, wildlife and wetlands to map and study upwards of 100,000 acres for the gold mining company to more accurately delineate wetlands from uplands in preparation for environmental impact permitting.
That is, of course, unless team members encountered wildfires. Or bears.
“If a bear shows up, our protocol is to carefully exit stage-left,” says Ross, project manager for the mapping and study, which his team completed in 2016 over a 42-day period living out of remote ‘lodges.’ “We do yearly bear safety training with our teams. If we have bears in the area, the crew determines an exit strategy, contacts the helicopter pilot [via satellite phone or radio], and the crew moves on to the next landing zone. They’ve never had to dispatch a bear, but they have had to back away.” Same goes for wildfires caused by lightning strikes, Ross says, noting that his team has had to avoid certain mapping areas to avoid smoke and flames.
Ross says Donlin Gold, LLC, hired Michael Baker last year to re-analyze the 100,000-acre study area after the U.S. Army Corps of Engineers (USACE) changed its manual requirements from requiring a “mosaic” approach to wetlands study to allowing an “absolute line” approach. Ross explains that, with the mosaic approach, which mathematically measures wetlands, analysis would focus on units of land. USACE determined that, if even 10 percent of the land within the unit were deemed wetland, the entire area was considered a wetland.
Consequently, the original wetland analysis, based on the 1987 USACE manual, identified 9,000 acres of wetlands that would impact the mine, transportation corridor, and a 315-mile pipeline to bring natural gas to the mine site to power the processing mill. As a result, the gold mining company would have been required, as part of the USACE permitting process, to devise costly restoration solutions to mitigate wetland losses; purchase wetland mitigation bank credits from other companies; or pay “In-lieu fee credits” to compensate for the wetland losses tied to the 9,000 acres.
Ross’s team, a group of 10 scientists and engineers, flew into remote locations in teams of two via a small helicopter, working with USACE to approve new mapping protocols using existing aerial maps, LiDAR, GPS and a boots-on-the-ground delineation study. The team completed gap analyses to determine ground targets and then completely remapped 100,000 acres for Donlin Gold.
The result: The more accurate mapping “reduced the actual wetlands impact by more than 4,000 acres,” says Ross, who retired from the USACE a little more than four years ago and joined Michael Baker in Anchorage. “That’s a huge number. It’s a monumental step to go from 9,000 acres to less than 5,000. Now the client, with defined wetland boundaries, can further adjust access roads, material sites, pipe storage yards, etc., within the pipeline corridor. The mine footprint also has been reviewed to adjust access roads and facilities that now have further flexibility to move around the mapped wetlands.”
The reduction in wetland delineation will allow Donlin Gold to reduce its wetland impacts and therefore its compensatory mitigation costs.
So what’s next for Michael Baker and Donlin Gold? Michael Baker is continuing to help with the permitting process, which is expected to take several years, as well as infrastructure efforts, including refinement of the route of the buried 14-inch pipeline, which will carry natural gas across the wilderness to the remote site to power the processing mill.
Once up and running, Donlin Gold expects to remove an overall average of 1.3 million ounces of gold annually from the open-pit mine over more than 27 years and employ more than 1,400.
“Nothing about this project is simple,” Ross says. “I’ve been working on this project for 20 years. It has been one complicated project.”